![]() |
In late 2010 I purchased this ex-car carrier and started what was to be a total strip and rebuild |
![]() |
It was a nice rig before I attacked it |
![]() |
Silverado tow tug |
![]() |
Not much left. Stripped for the frame alterations |
![]() |
Frame altered and ready for re-clading |
stretch panel lifted into place |
![]() |
passengers side fitted |
drivers side lined up for clading |
![]() |
front aluminium sheets fitted |
![]() |
trims and external doors fitted
|
![]() |
insulation started |
![]() |
internal walls, door and shower/toilet fit out |
![]() |
roof landing pad, solar panels and some hatches fitted |
![]() |
windows fitted |
![]() |
insulation all fitted out |
![]() |
timber frames for living area |
![]() |
always looks a little messy , bucket load off wires for the contol panel area |
![]() |
roof linning installed |
![]() |
sink and stove top area of kitchen |
![]() |
final fit-out of gooseneck towing assembly |
![]() |
road test |
![]() |
wall linning installed |
![]() |
helicopter and workshop area completed |
![]() |
time to see if all the measurements worked ( fits snug ) |
![]() |
great for parties too, band and stage all in one |
![]() |
longer road test (2000klm) to the goldcoast and return, all going great!! |
![]() |
suspension change, airbags and shocks fitted |
![]() |
looking from the end of the roof, heli pad finished |
![]() |
into the paint shop for a lot of work |
![]() |
all painted and looking very loud |
![]() |
signs to the front |
![]() |
signage to the side |
![]() |
and picture to the rear |
![]() |
on display at HTT Bankstown Airport |
![]() |
heading home from bankstown |
back home and back to the workshop with the chopper |