![]() |
| In late 2010 I purchased this ex-car carrier and started what was to be a total strip and rebuild |
![]() |
| It was a nice rig before I attacked it |
![]() |
| Silverado tow tug |
![]() |
| Not much left. Stripped for the frame alterations |
![]() |
| Frame altered and ready for re-clading |
| stretch panel lifted into place |
![]() |
| passengers side fitted |
| drivers side lined up for clading |
![]() |
| front aluminium sheets fitted |
![]() |
trims and external doors fitted
|
![]() |
| insulation started |
![]() |
| internal walls, door and shower/toilet fit out |
![]() |
| roof landing pad, solar panels and some hatches fitted |
![]() |
| windows fitted |
![]() |
| insulation all fitted out |
![]() |
| timber frames for living area |
![]() |
| always looks a little messy , bucket load off wires for the contol panel area |
![]() |
| roof linning installed |
![]() |
| sink and stove top area of kitchen |
![]() |
| final fit-out of gooseneck towing assembly |
![]() |
| road test |
![]() |
| wall linning installed |
![]() |
| helicopter and workshop area completed |
![]() |
| time to see if all the measurements worked ( fits snug ) |
![]() |
| great for parties too, band and stage all in one |
![]() |
| longer road test (2000klm) to the goldcoast and return, all going great!! |
![]() |
| suspension change, airbags and shocks fitted |
![]() |
| looking from the end of the roof, heli pad finished |
![]() |
| into the paint shop for a lot of work |
![]() |
| all painted and looking very loud |
![]() |
| signs to the front |
![]() |
| signage to the side |
![]() |
| and picture to the rear |
![]() |
| on display at HTT Bankstown Airport |
![]() |
| heading home from bankstown |
| back home and back to the workshop with the chopper |


































Awesome job brother! xo
ReplyDeleteLooking good at Bankstown airport!
ReplyDelete