Friday, January 11, 2013

A few pics of the helicopter build



In late 2006 I purchased these boxes of goodies."Wow" did I have a big job on my hands. Building a helicopter was one of the hardest things I have done




powdercoated frame and tail boom





fitting the body

dash fit out


nearly completed dash

getting close


transported to storage


out of storage and into the workshop to fitout the blades,
landing gear changed with longer skids for landing stability
out with the old style chain and oil bath

in with the upgraded cog drive system


out with the engine and over to the states for Andrew Burrs upgraded
bigger hp engine
my engine on Andrew's dyno in the states
all going fine with two hrs loaded run time



first startup with blades on and ground running



first hover



returned after first forward flight



flying over seven mile beach


first extended flight to Ailbion Park Airport Wollongong


cargo pod fitted


calibration of instruments at Bankstown Airport




No comments:

Post a Comment